Transmission Line Infrastructure Rebuild – Midwest
Aldridge was engaged to complete a critical segment of a transmission line rebuild in the Midwest, specifically targeting the most geologically and logistically challenging structures on the project. While the majority of the line had been established, the final structures required specialized means and methods that demand a high degree of technical discipline. This portion of the rebuild was defined by massive foundation requirements and some of the most severe weather conditions the region has to offer.
I-405/I-105 Freeway Tunnel Lighting Upgrade – California
The I-405/I-105 interchange is one of the most critical arteries in Southern California, handling over 250,000 vehicles per day. Aldridge served as the prime contractor for the Caltrans 405/105 Freeway Tunnel Lighting Upgrade, a project focused on replacing aging infrastructure with modern LED technology and intelligent control systems. The mission was to enhance driver safety and reduce long-term maintenance demands while ensuring minimal disruption to one of the nation's busiest corridors
Bridge Foundation Replacements – Illinois
On Chicago’s South Side, Aldridge supported the replacement of two aging railroad bridges located at 73rd Street and Cottage Grove Avenue. These critical structures are vital to regional transit, carrying more than 70 freight and commuter trains daily.
Large Scale 138kV Transmission Modernization - Ohio
Aldridge is leading a massive 86-mile transmission line installation and removal project for a major utility partner in the Midwest.
Western Access Tollway and Airport Interconnect – Illinois
Aldridge is contributing to the critical buildout of the I-490 Tollway, providing the essential Intelligent Transportation Systems (ITS) and power infrastructure that will support the new western gateway to O’Hare International Airport.
Terminal EV Charging Infrastructure – California
Infrastructure is the foundation of a net-zero future. Aldridge recently completed a critical EV charging project at the Port of LA, helping the terminal reach a milestone where 30% of its fleet is now electric.
Major Wastewater Treatment Plant Electrical Upgrades – Illinois
Aldridge is leading the electrical infrastructure upgrades at two of the largest wastewater treatment plants in DuPage County, modernizing systems that have supported millions of gallons of daily water treatment for decades
Airfield Infrastructure Renovation - Indiana
Aldridge executed a multi-phase rehabilitation of a 10,000 foot long runway, focusing on advanced technology and long-term energy resilience. The scope of work included a full LED conversion and the integration of sophisticated runway lighting and controls to improve airfield visibility and efficiency.
Express Lanes Access Improvement - Virginia
The Opitz Boulevard Access project is a design-build effort improving connectivity to and from the I-95 Express Lanes in Prince William County, Virginia. The project included relocating the southbound slip ramp into the express lanes and constructing a new access point from Opitz Boulevard, enhancing regional access to hospitals, shopping centers, and other key destinations.