Transmission Line Infrastructure Rebuild – Midwest

Aldridge was engaged to complete a critical segment of a transmission line rebuild in the Midwest, specifically targeting the most geologically and logistically challenging structures on the project. While the majority of the line had been established, the final structures required specialized means and methods that demand a high degree of technical discipline. This portion of the rebuild was defined by massive foundation requirements and some of the most severe weather conditions the region has to offer.

Read More

I-405/I-105 Freeway Tunnel Lighting Upgrade – California

The I-405/I-105 interchange is one of the most critical arteries in Southern California, handling over 250,000 vehicles per day. Aldridge served as the prime contractor for the Caltrans 405/105 Freeway Tunnel Lighting Upgrade, a project focused on replacing aging infrastructure with modern LED technology and intelligent control systems. The mission was to enhance driver safety and reduce long-term maintenance demands while ensuring minimal disruption to one of the nation's busiest corridors

Read More

Bridge Foundation Replacements – Illinois

On Chicago’s South Side, Aldridge supported the replacement of two aging railroad bridges located at 73rd Street and Cottage Grove Avenue. These critical structures are vital to regional transit, carrying more than 70 freight and commuter trains daily.

Read More