San francisco airtrain system

Aldridge was contracted to replace the existing people mover control system with radio based train controls throughout the facility. Modifications to the existing system are performed at night during 6 hour work windows on live track while new construction is executed during normal work hours. Additional scope included 36 wayside radio assembly.